Equipment configuration plan for environmentally friendly sand-making production line with a hourly production of 30 cubic meters of small pebbles
The establishment of a sand-making plant requires the support of a full set of sand-making production lines. A 30-cubic-meter pebble sand-making production line is produced at a time, which requires environmental protection standards. The capital for the full set of equipment configuration is less than 100,000, and more than 100,000. As mentioned earlier, it mainly depends on the detailed configuration. The following common configuration schemes are available for reference and understanding.:
1 cubic meter = 1.5 tons, hourly production of 30 cubic meters = about 45 tons;

Gravel processing plant equipment configuration plan:
PEX250x1000 jaw breaker (or HXGYS300 cone breaker) + VSI sand making machine + 2YYK2160 vibrating screen + XS2900 sand washing machine + vibrating feeder + several conveyor belts
This scheme is mainly suitable for pebbles with a raw material size ≤200mm. It has two functions of sand making and sand washing. The finished product is directly sanded, clean, of good quality, and has high market economic value, but at the same time, the initial price investment is slightly expensive, around 100,000 US dollars.