800 tph stone crusher plant

800 tph Stone crusher plantProduction Line IntroductionLarge-scale stone crushin
Send Inquiry
Description
Argument
Products Description

800 tph Stone crusher plant

Crushed stone type


Production Line Introduction


Large-scale stone crushing plant 800tph crusher plant is typically consists of primary, secondary, and tertiary crushers, screens, conveyors, and other equipment necessary for the crushing process.  Jaw crusher PE1200*1500 with capacity 400-1000 tph is used as primary crushing equipment. Secondary crushing equipment adopts two HPC cone crusher or impact crusher.It could produce sand & gravels with various granularities of limestone, granite, dolomite, quartz, ballast, basalt, marble, iron ore, cooper ore etc. 

800 tph stone crusher plant

Features

1. It could manufacture of aggregates (coarse aggregates, crusher run, rock sand, fine aggregates) from limestone, granite, andesite, etc. Coarse aggregates are usually used in ready mix concrete and asphaltic concrete. Crusher run is used for the bases and sub-bases for road making. Fine aggregates are used for the production of concrete and plastering.
2. The final size is 0-6mm(0-1/4' ), 6-12mm(1/4’-1/2’), 12-25mm( 1/2’-1’)(or other sizes according to your need) as aggregate for construction. 
3. High degree of automatic operation. The whole crushing plant requires sevral workers for machine starting and stopping, routine maintenance.
4. High production efficiency, regular end product granularity, good grain shape, and low powder content.
5. Adopting high advanced control system to ensure security and reliable operation of the entire stone crushing plant.

800 tph stone crusher plant


800tph Stone crushing plant flow chat

1. Raw material dump into the hopper by loader forklift, then feed into jaw crusher evenly and continuously by vibrating feeder for primary crushing. 

2. Then coarsely crushed materials are conveyed to transfer bin, which plays the role of transfer, buffering and adjustment. The size should generally be able to stack aggregates for next crushing equipment to run for 2 to 3 hours. 

3. Material from transfer bin is sent to secondary impact crusher for crushing process. Then goes to tertiary impact crusher to get requirement stone size.

4. The final crushed material goes to vibrating screen to classify final qualified products according to different size ranges as stock pile for sale, or for road builidng use. Unqualified materials will be carried back to the stone crushing equipment for recrushing.

5. Customer can classify final products according to different size ranges. All the final products are up to the related standards within and beyond China. Dust is generated during the working process while the dust control units are needed.


Tags: stone crusher plant

Technical parameter
Tower sand making building

Tower sand making building

Hard Rock Solutions

Hard Rock Solutions

Soft Rock Solutions

Soft Rock Solutions

Construction waste (heavy hamm

Construction waste (heavy hamm

Leave Your Message


Leave a message